Planning and Design of Hydro Electric Power Project: a Case Study of Proposed Low Head Hydropower Plant at Upper Chenab Canal - Ali Asghar Irajpoor - Grāmatas - LAP LAMBERT Academic Publishing - 9783659107238 - 2012. gada 3. maijs
Ja vāks un nosaukums nesakrīt, pareizs ir nosaukums

Planning and Design of Hydro Electric Power Project: a Case Study of Proposed Low Head Hydropower Plant at Upper Chenab Canal

Cena
€ 169,49

Pasūtīts no attālās noliktavas

Paredzamā piegāde . gada 12. - 20. nov.
Ziemassvētku dāvanas var atgriezt līdz 31. janvārim
Saņemiet paziņojumus par jauniem Ali Asghar Irajpoor izdevumiem
Pievienot savam iMusic vēlmju sarakstam

Not rated yet

Fundamentals of hydraulics and hydrology are used to present the basic theory necessary to understand hydropower engineering. The proposed hydel scheme lies on Upper Chenab Canal Lower at RD 283 using the available discharge data of UCC for past ten years, daily flow duration curve, hydrograph and rating curve are developed which are used to analyze and select suitable pattern for power generation. The proposed layout of the study recommended is conventional powerhouse with a spillway discharge downstream of RD 283. The procedures presented fill a need for an authoritative technique to help in the design and environmental aspects of planning for potential projects. Estimated total cost of the project is Rs. 219.509 million inclusive of Rs. 62.600 million as foreign exchange compared. Internal rate of return in case of this study is 32.95% Comparison of the results with equivalent diesel generation shows the economic viability of the project. Project is relatively marginal and very small in terms of energy contribution yet it is commended for implementation in view of acute shortage of electricity in the country at present.

Mediji Grāmatas     Paperback Book   (Grāmata ar mīksto vāku un līmēto muguru)
Izlaists 2012. gada 3. maijs
ISBN13 9783659107238
Izdevēji LAP LAMBERT Academic Publishing
Lapas 96
Izmēri 150 × 6 × 226 mm   ·   161 g
Valoda Vācu