Pastāsti draugiem par šo preci:
Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case - Lecture Notes in Economics and Mathematical Systems Arno Sprecher Softcover reprint of the original 1st ed. 1994 edition
Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case - Lecture Notes in Economics and Mathematical Systems
Arno Sprecher
Examining the problems of project scheduling under resource constraints, this study presents solution procedures for a broad class of performance measures and objectives. An algorithm for the generation of problem instances is described.
142 pages, 1 black & white illustrations, biography
| Mediji | Grāmatas Paperback Book (Grāmata ar mīksto vāku un līmēto muguru) |
| Izlaists | 1994. gada 27. maijs |
| ISBN13 | 9783540578345 |
| Izdevēji | Springer-Verlag Berlin and Heidelberg Gm |
| Lapas | 142 |
| Izmēri | 155 × 235 × 8 mm · 240 g |
| Valoda | Angļu |