Pastāsti draugiem par šo preci:
Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended / U S Government Accountability Office
Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /
U S Government Accountability Office
" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a housed them. "
| Mediji | Grāmatas Paperback Book (Grāmata ar mīksto vāku un līmēto muguru) |
| Izlaists | 2017. gada 28. jūlijs |
| ISBN13 | 9781973976530 |
| Izdevēji | Createspace Independent Publishing Platf |
| Lapas | 38 |
| Izmēri | 216 × 280 × 2 mm · 113 g |
| Valoda | Angļu |