Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - The Law Library - Grāmatas - Createspace Independent Publishing Platf - 9781727876659 - 2018. gada 15. oktobris
Ja vāks un nosaukums nesakrīt, pareizs ir nosaukums

Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)


Saņemt e-pastu, kad prece būs pieejama
Do you have a profile? Pierakstīties
Ziemassvētku dāvanas var atgriezt līdz 31. janvārim
Saņemiet paziņojumus par jauniem The Law Library izdevumiem
Pievienot savam iMusic vēlmju sarakstam

Not rated yet

Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission (Commission) is modifying the pro forma Small Generator Interconnection Agreement (SGIA). The pro forma SGIA establishes the terms and conditions under which public utilities must provide interconnection service to small generating facilities of no larger than 20 megawatts. The Commission is modifying the pro forma SGIA to require newly interconnecting small generating facilities to ride through abnormal frequency and voltage events and not disconnect during such events. The specific ride through settings must be consistent with Good Utility Practice and any standards and guidelines applied by the transmission provider to other generating facilities on a comparable basis. The Commission already requires generators interconnecting under the Large Generator Interconnection Agreement to meet such requirements, and it would be unduly discriminatory not to also impose these requirements on small generating facilities. The Commission concludes that newly interconnecting small generating facilities should have ride through requirements comparable to large generating facilities. This book contains: - The complete text of the Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Mediji Grāmatas     Paperback Book   (Grāmata ar mīksto vāku un līmēto muguru)
Izlaists 2018. gada 15. oktobris
ISBN13 9781727876659
Izdevēji Createspace Independent Publishing Platf
Lapas 30
Izmēri 178 × 254 × 2 mm   ·   72 g
Valoda Angļu