Pastāsti draugiem par šo preci:
Maximizing Machinery Uptime - Practical Machinery Management for Process Plants Bloch, Heinz P. (Consulting Engineer, Montgomery, TX, USA) 1. izdevums
Cena
€ 177,49
Pasūtīts no attālās noliktavas
Paredzamā piegāde . gada 17. nov. - . gada 1. dec.
Ziemassvētku dāvanas var atgriezt līdz 31. janvārim
Saņemiet paziņojumus par jauniem Bloch, Heinz P. (Consulting Engineer, Montgomery, TX, USA) izdevumiem
Pievienot savam iMusic vēlmju sarakstam
Maximizing Machinery Uptime - Practical Machinery Management for Process Plants
Bloch, Heinz P. (Consulting Engineer, Montgomery, TX, USA)
Explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. This text provides the tools to drastically improve machinery productivity and performance. It is a reference for maximizing the uptime of process equipment.
672 pages, Approx. 200 illustrations; Illustrations, unspecified
| Mediji | Grāmatas Hardcover Book (Grāmata ar cieto muguriņu un vāku) |
| Izlaists | 2005. gada 1. novembris |
| Oriģinālā izdošanas datums | 2006 |
| ISBN13 | 9780750677257 |
| Izdevēji | Elsevier Science & Technology |
| Lapas | 672 |
| Izmēri | 152 × 229 × 40 mm · 1,18 kg |
| Valoda | Angļu |